← Back to DesignService

BIM & Digital Design Coordination

Coordinated 3D information models to ISO 19650 — clash-detected before construction and handed over as a reliable digital asset.

What’s included

  • BIM execution plan and ISO 19650 information management framework.
  • Coordinated 3D model development across architectural, structural, and MEP.
  • Clash detection and coordination issue resolution.
  • Design information management and common data environment setup.
  • BIM model handover and as-built information delivery.
  • Facility management-ready digital asset documentation.

Building Information Modelling has become the standard framework for coordinating design information across architectural, structural, and MEP disciplines on any project of real complexity, and it deserves recognition as a distinct service rather than an invisible background process. This covers the development and management of coordinated 3D models in accordance with ISO 19650 — the international standard for BIM information management — clash detection between disciplines before construction, and the digital information handover that increasingly forms part of a project's deliverables.

Given Housing Hive's existing digital capability — including custom-built management and reporting tools — BIM and digital design coordination sits naturally alongside our other services as a genuine technical strength. Well-implemented BIM doesn't just reduce construction-phase clashes; it produces a richer, more accurate digital record of the built asset that supports facility management and future works long after construction is complete.

Build With Us

Have a project in mind?

Let's talk about what you're building.

Start a conversation